2021 Hyundai Palisade
1 / 5
★ FAIR
Hyundai logoSUV ★ FAIR

2021 Hyundai Palisade

Limited · Sierra Burgundy · Midwest City
$27,625
≈ $458/mo · 60mo @ 6.4%
↑ $316 above market
Listed 571d ago
Call dealer
7-day, 250-mile return window
Clean title — verified by Carfax
Frame inspection passed
Inspected by certified tech · est. score 93/100
Mileage
88,868 mi
Body
SUV
Drivetrain
AWD
Fuel
Gas
MPG
21 mpg
Accidents
None reported

About this Hyundai Palisade

This 2021 Hyundai Palisade Limited is listed at $27,625 with 88,868 miles on the odometer. Powertrain: 3.8L V-6 Gas V, Automatic, AWD. EPA-estimated fuel economy is 19 city / 24 highway MPG. Finished in Sierra Burgundy, this SUV is well suited to daily driving and longer trips. Available at Joe Cooper Hyundai in Midwest City, OK. Contact the dealer directly through Carlify to schedule a test drive or request more photos. Looking at other gas options? Use the related links below to compare similar listings on Carlify.

• Joe Cooper Hyundai **405-733-1611** Sierra Burgundy 2021 Hyundai Palisade Limited AWD V6 Recent Arrival! The Cooper Auto Group has been earning your trust since 1946. Welcome to the all-new Joe Cooper Hyundai. We have a large selection of new Hyundai vehicles for you to view. Please call, click, or come by today!

Inspection summary

Engine & drivetrain93
Brakes & suspension91
Interior condition94
Exterior condition95
Tires89
Electronics97

Inspection scores are estimates based on title status, accident history, and frame condition. Schedule a third-party inspection before purchase.

Fair price meter
Fair price
$316 above the median
GreatFairHigh
This car$27,625
Median for similar$27,309
5-year cost to own (est.)
Depreciation $9,945
Fuel $6,200
Insurance $7,100
Maintenance $3,400
Taxes & fees $2,348
Total estimated $28,993

Estimates from typical 12k mi/yr usage. Actuals vary.

Dealership

Joe Cooper Hyundai

6601 SE 29th St

Midwest City, OK73110

Hours
  • Mon8:30am – 8:00pm
  • Tue8:30am – 8:00pm
  • Wed8:30am – 8:00pm
  • Thu8:30am – 8:00pm
  • Fri8:30am – 8:00pm
  • Sat8:30am – 8:00pm
  • SunClosed

Similar Hyundaisuvs on Carlify

see all Hyundai suvs →