2023 Toyota GR Corolla
1 / 5
★ GREAT
Toyota logoHatchback ★ GREAT

2023 Toyota GR Corolla

Core · Black · Costa Mesa
$34,391
≈ $571/mo · 60mo @ 6.4%
↓ $1,450 below market
Listed 607d ago
Call dealer
7-day, 250-mile return window
Clean title — verified by Carfax
Frame inspection passed
Inspected by certified tech · est. score 93/100
Mileage
14,450 mi
Body
Hatchback
Drivetrain
AWD
Fuel
Gas
MPG
24 mpg
Accidents
None reported

About this Toyota GR Corolla

This 2023 Toyota GR Corolla Core is listed at $34,391 with 14,450 miles on the odometer. Powertrain: 1.6L Inline-3 Gas Inline, Manual, AWD. EPA-estimated fuel economy is 21 city / 28 highway MPG. Finished in Black, this Hatchback is well suited to daily driving and longer trips. Available at Audi Fletcher Jones in Costa Mesa, CA. Contact the dealer directly through Carlify to schedule a test drive or request more photos. Looking at other gas options? Use the related links below to compare similar listings on Carlify.

*Audi Fletcher Jones does not reserve, or hold advertised vehicles, all are subject to prior sale on a first come first serve basis. Customer must take delivery of the vehicle and execute all California required documentation at Audi Fletcher Jones. We reserve the right to revise price, equipment, mileage and certification status as a result of changing market conditions, manufacturer/distributor notices including recall notices, or error. All vehicle pricing expires upon close of business the same day. Audi Fletcher Jones presents this 2023 Toyota GR Corolla Core. This Toyota has 14,450 miles and comes in a Black-on-Black color combination. Live out of the area? Contact us to discuss convenient delivery options. (949) 791-1500 UPGRADED EQUIPMENT: Performance Package, Technology Package, Premium Carpet Mat Set, Connectivity Kit, Spider Cargo Net, Frameless Homelink Rearview Mirror, Vehicle Protection Package CONDITION: We offer the best cars in the country, at the best price. This vehicle has been meticulously inspected and reconditioned by factory trained technicians. Investing in state-of-the-art facilities, tools and training, our technicians go above and beyond the expectations of your pre-owned vehicle purchase. BENEFITS: There are many benefits to becoming a Fletcher Jones Owner. Complimentary services include car washes, Audi courtesy vehicles for extended repairs, John Wayne Airport pick up and drop off (your vehicle washed and ready upon your return), multi point vehicle inspections and much more. ABOUT US: Audi Fletcher Jones is located at 1275 Bristol Street, in Costa Mesa California. As an authorized Audi dealer, we offer a large selection new and pre-owned vehicle. We likely have the vehicle youve been searching for or contact us to find an exact configuration. If you live out of the area, ask us about our door-to-door delivery options.

Inspection summary

Engine & drivetrain93
Brakes & suspension91
Interior condition94
Exterior condition95
Tires89
Electronics97

Inspection scores are estimates based on title status, accident history, and frame condition. Schedule a third-party inspection before purchase.

Fair price meter
Great deal
$1,450 below the median listing price
GreatFairHigh
This car$34,391
Median for similar$35,841
5-year cost to own (est.)
Depreciation $12,381
Fuel $6,200
Insurance $7,100
Maintenance $3,400
Taxes & fees $2,923
Total estimated $32,004

Estimates from typical 12k mi/yr usage. Actuals vary.

Dealership

Audi Fletcher Jones

1275 Bristol St

Costa Mesa, CA92626

Hours
  • Mon8:00am – 8:00pm
  • Tue8:00am – 8:00pm
  • Wed8:00am – 8:00pm
  • Thu8:00am – 8:00pm
  • Fri8:00am – 8:00pm
  • Sat8:00am – 8:00pm
  • Sun9:00am – 7:00pm

Similar Toyotahatchbacks on Carlify

see all Toyota hatchbacks →