2017 Chevrolet Silverado 1500
1 / 5
★ EXCELLENT
Chevrolet logoPickup Truck ★ EXCELLENT

2017 Chevrolet Silverado 1500

High Country · Graphite Metallic · Fairfield
$24,900
≈ $413/mo · 60mo @ 6.4%
↓ $1,696 below market
Listed 635d ago
7-day, 250-mile return window
Clean title — verified by Carfax
Frame inspection passed
Inspected by certified tech · est. score 92/100
Mileage
100,506 mi
Body
Pickup Truck
Drivetrain
4WD
Fuel
Gas
MPG
17 mpg
Accidents
1 reported

About this Chevrolet Silverado 1500

This 2017 Chevrolet Silverado 1500 High Country is listed at $24,900 with 100,506 miles on the odometer. Powertrain: 5.3L V-8 Gas V, Automatic, 4WD. EPA-estimated fuel economy is 15 city / 20 highway MPG. Finished in Graphite Metallic, this Pickup Truck is well suited to daily driving and longer trips. Available at Performance Honda in Fairfield, OH. Contact the dealer directly through Carlify to schedule a test drive or request more photos. Looking at other gas options? Use the related links below to compare similar listings on Carlify.

This *2017 Chevrolet Silverado 1500 High Country* is loaded with convenient features like ENHANCED DRIVER ALERT PACKAGE, PREFERRED EQUIMENT GROUP 3LZ, LANE-DEPARTURE WARNING, LEATHER, NAVIGATION, REAR CAMERA, REMOTE START, BLUETOOTH, 4WD, BACKUP-SENSORS, TECH PKG, HEATED SEATS, COOLED SEATS, PARKING ASSIST, WELL MAINTAINED, HEATED-STEERING WHEEL, PREMIUM AUDIO, BED LINER, BLIND-SPOT MONITOR, FOG LAMPS, REMOTE ENTRY, MULTI-ZONE AC, POWER SLIDING REAR WINDOW, TINTED GLASS, ALLOY-WHEELS, WiFi Hotspot, SiriusXM.*Service and Maintenance Completed:* Our service department, staffed with factory-certified technicians, recently invested no less than *$130* in preventative maintenance and safety equipment upgrades such as Performed a Comprehensive 182-Point Inspection Plus Oil and Filter Change, providing you with this high quality used vehicle!This stunning *2017 Chevrolet Silverado 1500 High Country* located in Fairfield, OH features a beautiful *Graphite Metallic* exterior and a *Jet Black/medium Ash Gray Pipi* interior.Compare, adjust and save your payment options on every vehicle in stock at: PerformanceHondaStore.com*Technology and Entertainment Features Include:* GPS System, Premium Sound System, Remote Engine Start, WiFi Mobile Hotspot, Navigation System, Garage Door Opener, SiriusXM Satellite Radio, Bluetooth Connection, HD Radio, Keyless Entry and Dual Power Seats, Heated Front Seats, Air Conditioned Front Seats, Automatic Climate Control, Heated Steering Wheel, Leather Seats, Memory Seats, Power Drivers Seat, Adjustable Lumbar Seats, Leather Wrapped Steering Wheel, Compass, Steering Wheel Cruise Control, Illuminated entry, Pass-Through Rear Seat, Steering Wheel Audio Controls, Bucket Front Seats, Rear Reading Lights, Memory Mirrors, Sliding Rear Window, Driver Illuminated Vanity Mirror, Air Conditioning, Telescoping Wheel, Passenger Illuminated Visor Mirror, Center Console Storage, Steering Wheel Controls, Rear Seat Center Armrest, Auto Dimming R/V Mirror, Multi-zone Climate Control, Single-Disc CD Player, Split Folding Rear Seat, Reading Lights, Bench Seats, Auxiliary Audio Input, Tilt Steering Wheel, Overhead Console, AM/FM Stereo, Floor Mats, Center Armrest, Rear Window Defroster, Outside Temperature Gauge, Vanity Mirrors, Trip Odometer.*Safety and Economy Features Include:* Lane Departure Warning, Back-Up Camera, Active Park Assist, Lane Keeping Assist System, Rear Parking Aid, Electronic Stability Control, Front Collision Mitigation, Driver Restriction Features, Brake Assist, Integrated Turn Signal Mirrors, Daytime Running Lights, Security System, Front Collision Warning, Auto Highbeams, Drivers Air Bag, ABS Brakes, Tire Pressure Monitoring System, Speed Sensitive Power Steering, Delay-off headlights, Overhead airbag, Auto-Dimming Door Mirrors, Dual Air Bags, Rear Air Bag, Driver Front Side Impact Air Bag, Passenger Air Bag Sensor, Front Head Air Bag, Passenger Front Side Impact Airbag.This vehicle has an EPA rated fuel economy of 20.0 highway / 15.0 city1.Performance Honda proudly offers our customers many at-home services including *Performance Valet*! When you purchase from Performance Honda, you will be eligible for *FREE Pickup & Delivery*^ for your future service appointments! We value your time and that's why we want to give you the best buying and service experiences in the Greater Cincinnati area! Also, ask your product specialist about our home test drives and deliveries. Save time and money through our exclusive Performance Remote Services! Distance limitations may apply.Our dealership is conveniently located on Route 4 in Fairfield, Ohio. We proudly serve the communities of Fairfield, Colerain, Hamilton, Forest Park, Springdale, Northbrook, North College Hill, White Oak, Sharonville, Finneytown, Cincinnati, Dayton, and Norwood. As a proud member of the family-owned Performance Automotive Network, we have access to thousands of new and used vehicles. This gives us the ability to find the perfect vehicle to fit your needs and budget.*Need financing assistance?* Our strong, group-wide relationships with several lending institutions allow us to offer the most competitive rates! We will give you top-dollar for your trade or make you a cash offer if you'd prefer the convenience of selling us your vehicle directly.With our aggressive pricing strategy, most vehicles sell within the first few weeks, so please contact us ahead of time at *513-829-7300* to ensure this vehicle is still available and ready for your test drive.*We'll Put A Smile On Your Face! *1Based on EPA mileage ratings. Use for comparison purposes only. Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, etc.*Terms and conditions of warranties vary by brand and vehicle. See dealer for complete details or sign in to download a copy of your vehicle's warranty. Warranty may be restricted or denied if your vehicle or part has been modified, improperly maintained or removed.

Inspection summary

Engine & drivetrain93
Brakes & suspension91
Interior condition94
Exterior condition87
Tires89
Electronics97

Inspection scores are estimates based on title status, accident history, and frame condition. Schedule a third-party inspection before purchase.

Fair price meter
Listed price
$1,696 below the median listing price
GreatFairHigh
This car$24,900
Median for similar$26,596
5-year cost to own (est.)
Depreciation $8,964
Fuel $6,200
Insurance $7,100
Maintenance $3,400
Taxes & fees $2,117
Total estimated $27,781

Estimates from typical 12k mi/yr usage. Actuals vary.

Dealership

Performance Honda

5760 Dixie Hwy

Fairfield, OH45014

Hours
  • Mon9:00am – 8:00pm
  • Tue9:00am – 8:00pm
  • Wed9:00am – 8:00pm
  • Thu9:00am – 8:00pm
  • Fri9:00am – 8:00pm
  • Sat9:00am – 6:00pm
  • SunClosed

Similar Chevroletpickup trucks on Carlify

see all Chevrolet pickup trucks →